SE1010 -- Lab 1: First Program

Details

Details for this assignment are located here.

Lab Deliverables (due 11:00pm, the day prior to week 3 lab)

Each student should indicate how much time you spend on this assignment in the FAST system. You are encouraged to log your activity as you work on the project. At a minimum, you should log all of the time spent on this assignment before the due date given above. All time spent on this assignment should be entered into the week 2 column (even if you worked on it in week 3).

The Lab1App.java file should be submitted electronically here as the first file (Report File). The UML diagrams may be submitted as image files or on paper. If they are submitted electronically, they should be placed in one .zip file and be submitted as the second file (Support File).

Acknowledgment

This laboratory assignment was developed by Dr. Mark Hornick.

  • © 2001-2009 Dr. Christopher C. Taylor •
  • Office: L-343 •
  • Phone: 277-7339 •
  • npǝ˙ǝosɯ@ɹolʎɐʇ