DetailsDetails for this assignment are available here Partner LabYou must work with your assigned partner for this and future assignments. You and your partner should use the same XP-dev account as was used for lab 3 and lab 4 but create a new repository to use for this assignment. Lab deliverables (due 11:00pm, the day prior to week 7 lab)Each group must create a respository called se2811-drawing at XP-Dev.com. (The URL to access the repository should be svn.xp-dev.com/svn/taylor-se2811-drawing where taylor is replaced by one of your MSOE logins.) In addition, you must grant read permission to user taylor and write permission to your partner. Your repository must have three top-level directories: branches, tags, and trunk. The trunk must contain the working copy of either the src subdirectory from your Eclipse project or the Eclipse project directory with the bin directory excluded. Do not include the bin directory in your respository. In addition to your source code, you must place a .png image of your UML class diagram in your repository (in an obvious place). Be sure to document your code. When you are ready to submit your solution to this assignment, create a tag (in the tags subdirectory) labelled lab5. Each student must log the time spent on this assignment in FAST system in the week 6 column. Lab demonstration (due at the beginning of week 7 lab)Each team must demonstrate their working program at the beginning of lab. |